CONSTRUCTION & OPENING PREPARATIONS

13. EQUIPMENT INSTALLATION
Bringing your vision to life
Once construction is nearly complete and the space is prepped, it’s time for equipment installation — one of the final and most exciting phases of building your practice. This is when your operatories, sterilization center, digital imaging systems, and technology infrastructure are delivered and professionally installed. Your Henry Schein equipment specialist will coordinate with your contractor and design team to ensure each piece fits seamlessly into the space as planned.
From plumbing and power connections to placement precision, every detail matters. Your installation team will verify that all systems are functioning properly, equipment is calibrated, and the layout supports efficient workflows and ergonomics. With expert support, your practice is set up for smooth operations from Day one — ready for patients, performance, and growth.
What to expect during equipment installation
- Delivery coordination with your contractor and site lead
- Pre-install walkthrough to confirm connections (power, plumbing, air, vacuum)
- Professional setup of all major equipment: chairs, cabinetry, lights, sterilization, etc.
- Digital tech & imaging systems installed and networked
- System calibration and function testing
- Ergonomic positioning to support efficient workflows
- Final checks to ensure layout matches your plans
- Post-installation training on how to use and maintain your new equipment